Zhejiang local standard "River (Lake) Changching Work Specification" officially implemented

Zhejiang local standard "River (Lake) Changching Work Specification" officially implemented

  Comprehensive implementation of the long system of the river (lake), the Party Central Committee, the State Council to strengthen the major decision-making deployment made by the management of rivers and lakes, is the internal requirements of the green development and promote the construction of ecological civilization. Recently, Zhejiang local standards "River (Lake) Long-made Work Code" (DB33 / T2361-2021) (hereinafter referred to as "Specifications") officially implemented, boosting the river (lake) long-made work and then new steps. At present, under the guidance of the "Zhejiang River Long System" issued in 2017, there are about 10,000 provinces, municipalities, counties, townships and villages, and the five-level rivers and lakes, basically form a complete set of rivers and lakes. Enter the system and long-term mechanism. However, "Zhejiang River Long System" only proposes a program, principled requirements for river long system, and urgently need an operability and can be specified and guided. In order to further deepen the management of Zhejiang River (Lake), the River (Lake) long-term assessment system, effectively improve the management level and comprehensive quality of the river (lake) long, from 2019, Zhejiang started research to prepare Zhejiang local standard rivers ( Lake) Long-made Work Specification. After a test, discussions, discussions and comments, Zhejiang local standards "River (Lake) long-standing work norms" was approved by Zhejiang Provincial Market Supervision Administration, by Zhejiang Beautiful Zhejiang Construction Leading Group River Long System, Zhejiang Water Resources Department Joint issued.

  As the first provincial standard, scientific norm, effective practicality, which has a guiding role in the river (lake) long-term work, is the greatest feature of "norms".

"Standard" covers the basic requirements, work content, implementation requirements, information disclosure and archive management of the river (lake) long, and promoting the long-term work of the river (lake) from "chapter" to " "Rebond to" label ".

  At the construction of the personnel, "Standards" propose to set up provincial, municipal, county, township four-level river long, and follow the principles of the combination of the basis of the unity and grading segments (film) management, provincial, city, county, township , The village five-level river lake leader organizational system; the river (lake) has been adjusted, and the work handover should be completed within 10 working days; the county level and the above river (lake) long adjustment period, the river (lake) long Contact some of the contacts should be duty; during the rural river (lake) long adjustment period, the hometown total river head should designate the person in charge of the same level to perform. In the inspection requirements, "Standards" clear the provincial river (lake) long inspection work should not be less than 1 time each year, the city-level river (lake) long inspection work should not be less than 1 time, county-level river (lake) The long inspection work should not be less than 1 time, the hometown river (Lake) long inspection work should not be less than 1 month, the village-level river (lake) long inspection work should not be less than 1 time, and The main responsibility of the long rivers (lakes).

The township, the village-level river lake leader inspected on-site inspection, mainly inspected the illegal invade the waters, illegal sands, and throwing a lot of life garbage, sewage direct (stealing, leak) row in the management of the river lake.

  In response to the problem of the river (Lake) long inspection, "Standards" is divided into slight problems, general problems, major problems, three categories, 10 working days, respectively, 30 working days, respectively, 30 working days, respectively, 30 working days, 30 working days A working day.

Problems and classifications are based on formalization, monogram, normative, and strong guidance. For example, there is a slight problem with domestic garbage or construction waste, landfill, storage, and stacking.

  In addition, "Regulating" has made regulations against rivers (lake) long publicity, publicity and public participation, files. The relevant person in charge said that the development and implementation of the "Specification" will promote local standards to carry out the long system of rivers (lake), improve the effectiveness of river lake management, enhance the sense of acquaintance and happiness of the society, and provide strong Zhejiang construction Powerful support and protection. (Meilin Rong) (Editor-in: Ye Bing, Kang Mengqi) Sharing let more people see recommendation reading.